Sound Insulation
Two parameters describe sound insulation; Dw and Rw. Dw is the insulation between rooms. Rw is the lab-tested insulation of a wall/floor...more
Air Testing & Leakage
Our engineers use Thermal camera and extensive knowledge of buildings to help find leakage areas within the building and can advice of these.
Borders - Party Wall Sound Testing - 0141 894 0107
The office that covers this area is: Glasgow
The towns & cities that are covered within this county are:
Coldstream, Earlston, Eyemouth, Galashiels, Hawick, Innerleithen, Jedburgh, Kelso, Melrose, Peebles, Selkirk,
Phone Number: 0141 894 0107 Email: borders@e2consultants.co.uk
Commercial_Sound_Testing is sometimes referred to as Commercial Sound & Acoustic Insulation Testing, Commercial Sound Insulation Testing, Commercial Part E Compliance, Commercial Sound Testing, Commercial Acoustic Testing.
Party Wall Sound Testing Testing in Borders
E2 Consultants specialise in the provision of high quality and practical acoustic consultancy to both the public and private sectors; typically working with residential and commercial developers, architects, planning consultants, industry, local planning authorities and environmental services.
We believe that our Party Wall Sound Testing consultants, service delivery across the UK is second to none and that clients retain our expert services because of our continuous commitment to providing high quality and cost effective advice. Our expert advice has been sought for different types of new build, refurbished and converted developments including residential, commercial, entertainment, leisure and hotels, in addition to a wide variety of mixed-use developments.
We actively encourage clients in Borders to seek our services at the earliest opportunity since the integration of acoustic issues into the overall design of a development should remove the need for costly revisions.
E2 Consultants's Party Wall Sound Testing testing consultants in Borders have been involved in building and architectural projects at all stages of development, from the specification of the external building envelope and internal separating elements, through to pre-completion testing.
For a quote or more information call one of our UK consultants in Borders on 0141 894 0107 or email borders@e2consultants.co.uk.
At E2 Consultants we offer nationwide acoustic consultancy, which involves comprehensive services across all aspects of noise measurement, assessment and control.
Guidance in ADE 2003 on pre-completion testing indicates that tests should be carried out at a rate of one set of tests of each construction sub-group completed, whatever the size of the development and thereafter at least one set of tests every ten completions (assuming no failures).
Advice is given on the materials and construction details for separating floors and walls and the key interfaces with other building elements. We also offer advice on the additional requirements of ADE 2003 including the control of reverberation in common areas and the performance of internal walls and floors.
The onus is on the developer to perform pre-completion testing before the property can be 'released to market' and it is now an offence not to perform pre-completion testing. We often advise property developers, contractors, housing associations and local authorities on the implications of ADE 2003.
In July 2003, the new Approved Document E 'Resistance to the Passage of Sound' (ADE 2003) of the Building Regulations came into force. This requires that new residential properties and rooms for residential purposes be tested (known as pre-completion testing) to demonstrate compliance with the explicit sound insulation performance requirements of ADE 2003.
We advise a number of clients on the practical application of RSDs as in some instances the option for construction are potentially reduced and construction costs may be significantly higher than those of a non-RSD structure.
Pre-Completion Testing
The table below outlines the sets of tests required for new and converted properties.
Property Types | Test Requirements |
Dwelling-houses Including bungalows |
Normally, one set of tests should comprise of two individual Sound Insulation Tests (SITs)(two airborne tests):1. Living room (wall) And 2.Bedroom (wall) |
Flats with separating floor but not walls |
Normally, one set of tests should comprise of four individual SITs (2 x airborne, 2 x impact): 1. Living room (airborne), 2.Living room (Impact), 3. Bedroom (airborne) and 4. Bedroom (Impact) |
Flats with separating floor and walls |
Normally, one set of tests should comprise of six individual SITs (4 x airborne, 2 x impact): 1. living room/living room (floor, airborne), 2. living room/living room (floor, impact), 3. bedroom/bedroom (floor, airborne), 4. bedroom/bedroom (floor, impact), 5. living room/living room (wall, airborne) and 6. bedroom/bedroom (wall, airborne) |
Rooms for Residential Purposes |
To conduct a set of tests, the sound insulation between the main rooms should be measured according to the principals set out above for new buildings and material change of use, but adapting them to suit the circumstances. |
For further Party Wall Sound Testing information for your area, be sure to check out Sound-Testing-Glasgow.co.uk.