Offices Nationwide
Point of Reference
10 dBA is the sound level of normal human breathing. To put it into perspective, thunder is a whopping 120 dBA...more
Air Testing & Leakage
We can offer additional services at discounted rates along side our tests! These are Sound Testing and Part F. Ask our Consultants for more
Part L1A
Conservation of fuel and power IN NEW DWELLINGS
Adlington - TER DER Calculations - 0161 403 0129
The office that covers this area is: Manchester
Phone Number: 0161 403 0129 Email: adlington@e2consultants.co.uk
SAP Calculations is sometimes referred to as SAP Conversion Calcs, Part L1B Compliance, SAP Conversion rating, SAP Conversion Calculations, SAP Conversion Assessment, SAP Conversion Calc.
What Is A SAP Calculation?
A SAP rating represents the cost of energy required by a property over the course of a year with a score of 100 meaning there's no energy cost. This is calculated from lighting, heating, hot water systems, renewable technolgies used and the elements of structure. The higher the score, the lower the cost of running it.
SAP calculations are the Government's Standard Assessment Procedure for Energy Ratings. In order to produce an On Construction EPC (Energy Performance Certificate) or a Predicted Energy Assessment (PEA), a SAP is required, as this is the calculation these certificates are based on.
How Is A SAP Assessment Undertaken?
The SAP software will determine if a building complies with Building Regulations in Adlington using the information provided by the SAP assessment. This crucial information relates to the type of dwelling, floors, walls, the roof, windows, doors, lighting, renewable technologies, 'U' values, hot water and ventilation.
Amongst other things, the SAP assessor will determine how good the thermal elements are in the floors and walls as well as how well heat passes through these elements - this is known as a 'U' value. A high 'U' value represents a high amount of heat lost - this is used in the SAP calculation which is done off-site but requires plans and drawings of the site in order to be calculated.
Why Do I Need A SAP Calculation?
When changes are made to the heating, hot water provision or air conditioning/ventilation services, it is the responsibility of the builder to provide any On Construction EPCs upon completiong of a new home or conversion into fewer or more units.
If you are selling a home before it has been built, you will need to provide information about energy efficiency in a Predicted Energy Assessment (PEA).
Under Part L of Building Regulations in Adlington, since 2006, any new dwellings or conversions need to have a SAP Calculation and Predicted EPC before any work can begin.
Copyright 2024 E2 Specialist Consultants Limited
Company No. 06728970