Noise Disturbance
Building acoustics can help to mitigate the effects of noise disturbance which can have negative effects on your health and well-being...more
Birnam - Commercial Air Integrity Testing - 0141 894 0107
The office that covers this area is: Glasgow
Phone Number: 0141 894 0107 Email: birnam@e2consultants.co.uk
Commercial_Air_Testing is sometimes referred to as Commercial AIR tightness testing, Commercial AIR tightness tests, Commercial AIR pressure tests, Commercial AIR tests, Commercial AIR pressure testing.
Commercial Air Integrity Testing in Birnam
At E2 Consultants we offer Commercial Air Integrity Testing throughout Birnam and surrounding areas. Our experienced Commercial Air Integrity Testing assessors will also be happy to offer advice on the best ways to gain your target rating. The number of properties to be tested should be in accordance with the following table:
According to Part L1a, an air pressure test needs to be undertaken on 50% of all dwelling types or three units of each type depending on which value is smaller. A block of flats is considered as a separate development and should be treated as such no matter on the number of blocks on the site. Furthermore, the testing should be done on the first batch of each type of dwelling to be completed. The need to test multiple versions of each type is to confirm the design and construction procedures are up to code according to Government regulations.
The dwellings that make up the test sample are to be chosen by the Building Control Body (BCB) as well as the pressure tester. When selecting the dwellings it should be taken into account that half of the tests for each type should be scheduled during construction of the first 25% of that type. All results, including failures, should be reported back to the BCB. Undertaking the test early in the project means any adjustments can be made before the majority of construction is complete.
Envelope Area (m2) | Leakage Rates (m3/hr at 50Pa) | |||||
5 | 7.5 | 10 | 15 | 20 | 25 | |
2000 | 0.51 | 0.76 | 1.01 | 1.52 | 2.03 | 2.54 |
5000 | 1.27 | 1.90 | 2.54 | 3.80 | 5.07 | 6.34 |
7500 | 90 | 2.85 | 3.80 | 5.71 | 7.61 | 9.51 |
10000 | 2.54 | 3.80 | 5.07 | 7.61 | 10.14 | 12.68 |
12500 | 3.17 | 4.75 | 6.34 | 9.51 | 12.68 | 15.85 |
15000 | 3.80 | 5.71 | 7.61 | 11.41 | 15.21 | 19.02 |
20000 | 5.07 | 7.61 | 10.14 | 15.21 | 20.29 | 25.36 |
It is a requirement under the Building Regulations 2015 Part L that new dwellings in Birnam must pass an Commercial Air Integrity Testing prior to occupation; this test certificate must be produced for the dwelling to be signed off by local Birnam building control.
The report has all the details required by the regulations to indicate that a valid test has been performed.
To carry out such a test with accurate results, we require some general requirements to be made available at the time of the test:
1. SAP Design air pressure test figure
2. Electricity supply
3. Water supply to enable traps to be filled
We will seal all of the intentional leakage areas in the house prior to testing. These include: fireplaces, extractor fans, exhaust fans, trickle vents and the odd uninstalled component. Everything else will have to stay 'as is' in the property.
It's strongly suggested that if you've never had a test before, that you review our air pressure / tightness pre-test checklist below.
Air Tightness Pre-Test Checklist
For a quote or for more information, call our Birnam air tightness / pressure testing consultant on 0141 894 0107 or email birnam@e2consultants.co.uk
For further Commercial Air Integrity Testing information for your area, be sure to check out Air-Testing-Glasgow.co.uk.
Copyright 2024 E2 Specialist Consultants Limited
Company No. 06728970