Sound Transmissions
Paths can be interrupted by insulation and blocking air paths. A material's insulation is governed by mass, stiffening and damping...more
Air Testing
As part of thermographic surveys we can also use an air Pressure testing kit to depressurise the building and help detect any air leakage within the property..more
Thermal Bridging And Airtightness
Enhanced Construction Details
Buxton - Air Pressure Testing - 0114 368 0192
The office that covers this area is: Sheffield
Phone Number: 0114 368 0192 Email: buxton@e2consultants.co.uk
Commercial_Air_Testing is sometimes referred to as Commercial AIR tightness testing, Commercial AIR tightness tests, Commercial AIR tests, Commercial AIR pressure testing, Commercial AIR pressure tests.
Air Pressure Testing in Buxton
Our air consultants offer constructive advice for Air Pressure Testing on what is the best way to reach your target rating.
The dwellings that make up the test sample are to be chosen by the Building Control Body (BCB) as well as the pressure tester. When selecting the dwellings it should be taken into account that half of the tests for each type should be scheduled during construction of the first 25% of that type. All results, including failures, should be reported back to the BCB. Undertaking the test early in the project means any adjustments can be made before the majority of construction is complete.
According to Part L1a, an air pressure test needs to be undertaken on 50% of all dwelling types or three units of each type depending on which value is smaller. A block of flats is considered as a separate development and should be treated as such no matter on the number of blocks on the site. Furthermore, the testing should be done on the first batch of each type of dwelling to be completed. The need to test multiple versions of each type is to confirm the design and construction procedures are up to code according to Government regulations.
Envelope Area (m2) | Leakage Rates (m3/hr at 50Pa) | |||||
5 | 7.5 | 10 | 15 | 20 | 25 | |
2000 | 0.51 | 0.76 | 1.01 | 1.52 | 2.03 | 2.54 |
5000 | 1.27 | 1.90 | 2.54 | 3.80 | 5.07 | 6.34 |
7500 | 90 | 2.85 | 3.80 | 5.71 | 7.61 | 9.51 |
10000 | 2.54 | 3.80 | 5.07 | 7.61 | 10.14 | 12.68 |
12500 | 3.17 | 4.75 | 6.34 | 9.51 | 12.68 | 15.85 |
15000 | 3.80 | 5.71 | 7.61 | 11.41 | 15.21 | 19.02 |
20000 | 5.07 | 7.61 | 10.14 | 15.21 | 20.29 | 25.36 |
Air Pressure Testing is sometimes referred to as an Air Pressure Test, Envelope Test or an Air Permeability Test.
It is a requirement under the Building Regulations 2015 Part L that new dwellings in Buxton must pass an Air Pressure Testing prior to occupation; this test certificate must be produced for the dwelling to be signed off by local Buxton building control.
The report has all the details required by the regulations to indicate that a valid test has been performed.
To carry out such a test with accurate results, we require some general requirements to be made available at the time of the test:
1. SAP Design air pressure test figure
2. Electricity supply
3. Water supply to enable traps to be filled./p>
We will seal all of the intentional leakage areas in the house prior to testing. These include: fireplaces, extractor fans, exhaust fans, trickle vents and the odd uninstalled component. Everything else will have to stay 'as is' in the property.
It's strongly suggested that if you've never had a test before, that you review our air pressure / tightness pre-test checklist below.
Air Tightness Pre-Test Checklist
For a quote or for more information, call our Buxton air tightness / pressure testing consultant on 0114 368 0192 or email buxton@e2consultants.co.uk
For further Air Pressure Testing information for your area, be sure to check out Air-Testing-Sheffield.co.uk.