Offices Nationwide 

Cadishead - Domestic Carbon Emission Calc - 0161 403 0129

The office that covers this area is: Manchester

Phone Number: 0161 403 0129 Email: cadishead@e2consultants.co.uk

SAP Calculations is sometimes referred to as SAP Conversion rating, SAP Conversion Calcs, SAP Conversion Calc, SAP Conversion Assessment, Part L1B Compliance, SAP Conversion Calculations.

What Is A SAP Calculation?

SAP calculations are the Government's Standard Assessment Procedure for Energy Ratings. In order to produce an On Construction EPC (Energy Performance Certificate) or a Predicted Energy Assessment (PEA), a SAP is required, as this is the calculation these certificates are based on.

The higher the SAP rating, the lower the cost will be to run the building. The score represents the cost of energy required by a property over the course of a year with a 100 score meaning there's no energy cost. To calculate the SAP, the assessor uses information relating to lighting, heating, hot water systems, renewable technolgies used and the elements of structure.

How Is A SAP Assessment Undertaken?

The SAP software will determine if a building complies with Building Regulations in Cadishead using the information provided by the SAP assessment. This crucial information relates to the type of dwelling, floors, walls, the roof, windows, doors, lighting, renewable technologies, 'U' values, hot water and ventilation.

A SAP is done off-site but requires plans and drawings of the site in order to be calculated. Amongst other things, the SAP assessor will determine how good the thermal elements are in the floors and walls and how well heat passes through these elements - this is known as a 'U' value. A high 'U' value represents a high amount of heat lost - this is used in the SAP calculation.

Why Do I Need A SAP Calculation?

Under Part L of Building Regulations in Cadishead, since 2006, any new dwellings or conversions need to have a SAP Calculation and Predicted EPC before any work can begin.

When changes are made to the heating, hot water provision or air conditioning/ventilation services, it is the responsibility of the builder to provide any On Construction EPCs upon completiong of a new home or conversion into fewer or more units.

You will need to provide information about energy efficiency in a Predicted Energy Assessment (PEA) if you are planning to sell the property before it has been built.

E2 Specialist Consultants
August 13 at 1:29pm
Today takes 2 of our engineers, air testing this enormous modular classroom in Tring, It took 4 fans to test this space and unfortunately resulted in a Fail. Remedial sealing will be required to areas that we have identified as leaking cold air infiltration. #preperationiskey

E2 Consultants Delivering compliance solutions for Architects & Developers    Head Office E2 HOUSE, South Park Way, Wakefield 41 Business Park, WF2 0XJ    Questions? Call: 0800 043 8100