Offices Nationwide
Reverberation Time
The reverberation time of a room is defined as the time it takes for sound to decay by 60 dB after an abrupt termination...more
Air Testing & Leakage
We can offer additional services at discounted rates along side our tests! These are Sound Testing and Part F. Ask our Consultants for more
Part E
Resistance of the Passage of Sound
Eastwood - SAP Rating - 0114 368 0192
The office that covers this area is: Sheffield
Phone Number: 0114 368 0192 Email: eastwood@e2consultants.co.uk
SAP Calculations is sometimes referred to as SAP Conversion Calcs, Part L1B Compliance, SAP Conversion Calc, SAP Conversion Assessment, SAP Conversion Calculations, SAP Conversion rating.
How Is A SAP Assessment Undertaken?
Amongst other things, the SAP assessor will determine how good the thermal elements are in the floors and walls as well as how well heat passes through these elements - this is known as a 'U' value. A high 'U' value represents a high amount of heat lost - this is used in the SAP calculation which is done off-site but requires plans and drawings of the site in order to be calculated.
The crucial information needed for the SAP software relates to the type of dwelling, floors, walls, the roof, windows, doors, lighting, renewable technologies, 'U' values, hot water and ventilation. With this, we can determine if a building complies with Building Regulations in Eastwood.
What Is A SAP Calculation?
The higher the SAP rating, the lower the cost will be to run the building. The score represents the cost of energy required by a property over the course of a year with a 100 score meaning there's no energy cost. To calculate the SAP, the assessor uses information relating to lighting, heating, hot water systems, renewable technolgies used and the elements of structure.
A SAP calculation, the Government's Standard Assessment Procedure for Energy Ratings, is required to produce an On Construction EPC (Energy Performance Certificate) or a Predicted Energy Assessment (PEA).
Why Do I Need A SAP Calculation?
Under Part L of Building Regulations in Eastwood, since 2006, any new dwellings or conversions need to have a SAP Calculation and Predicted EPC before any work can begin.
It is the responsibility of the builder to provide any On Construction EPCs when a home is constructed. This will also apply if a building is converted into fewer or more units (material change of use) and changes are made to the heating, hot water provision or air conditioning/ventilation services.
You will need to provide information about energy efficiency in a Predicted Energy Assessment (PEA) if you are planning to sell the property before it has been built.