Offices Nationwide
Sound Intensity
Sound intensity's measured in Decibels (dB). An logarithmic scale where an increase of 10 dB gives an apparent doubling of loudness...more
Good Hearing?
A typical person with good hearing can hear from about 20Hz to 20kHz (the audio bandwidth). A person's voice will usually range from 500Hz to 2kHz...more
Part E
Resistance of the Passage of Sound
Essington - SAP Calc - 0121 381 0129
The office that covers this area is: Birmingham
Phone Number: 0121 381 0129 Email: essington@e2consultants.co.uk
SAP Calculations is sometimes referred to as SAP Conversion Assessment, SAP Conversion Calculations, SAP Conversion Calc, SAP Conversion rating, Part L1B Compliance, SAP Conversion Calcs.
How Is A SAP Assessment Undertaken?
A SAP is done off-site but requires plans and drawings of the site in order to be calculated. Amongst other things, the SAP assessor will determine how good the thermal elements are in the floors and walls and how well heat passes through these elements - this is known as a 'U' value. A high 'U' value represents a high amount of heat lost - this is used in the SAP calculation.
The crucial information needed for the SAP software relates to the type of dwelling, floors, walls, the roof, windows, doors, lighting, renewable technologies, 'U' values, hot water and ventilation. With this, we can determine if a building complies with Building Regulations in Essington.
Why Do I Need A SAP Calculation?
When changes are made to the heating, hot water provision or air conditioning/ventilation services, it is the responsibility of the builder to provide any On Construction EPCs upon completiong of a new home or conversion into fewer or more units.
You will need to provide information about energy efficiency in a Predicted Energy Assessment (PEA) if you are planning to sell the property before it has been built.
Under Part L of Building Regulations in Essington, since 2006, any new dwellings or conversions need to have a SAP Calculation and Predicted EPC before any work can begin.
What Is A SAP Calculation?
SAP calculations are the Government's Standard Assessment Procedure for Energy Ratings. In order to produce an On Construction EPC (Energy Performance Certificate) or a Predicted Energy Assessment (PEA), a SAP is required, as this is the calculation these certificates are based on.
The higher the SAP rating, the lower the cost will be to run the building. The score represents the cost of energy required by a property over the course of a year with a 100 score meaning there's no energy cost. To calculate the SAP, the assessor uses information relating to lighting, heating, hot water systems, renewable technolgies used and the elements of structure.
Copyright 2024 E2 Specialist Consultants Limited
Company No. 06728970