Offices Nationwide
Environmental Noise Levels
The max exposure time at 85 dBA is 8 hours, at 110 dBA it's just 1 min 29 seconds. If exposed, limit the time and wear hearing protection...more
Air Testing & Leakage
We can offer additional services at discounted rates along side our tests! These are Sound Testing and Part F. Ask our Consultants for more
Homerton - TER DER Calc - 020 3390 0301
The office that covers this area is: London
Phone Number: 020 3390 0301 Email: homerton@e2consultants.co.uk
SAP Calculations is sometimes referred to as SAP Conversion Assessment, SAP Conversion Calc, Part L1B Compliance, SAP Conversion Calcs, SAP Conversion Calculations, SAP Conversion rating.
What Is A SAP Calculation?
A SAP calculation, the Government's Standard Assessment Procedure for Energy Ratings, is required to produce an On Construction EPC (Energy Performance Certificate) or a Predicted Energy Assessment (PEA).
The higher the SAP rating, the lower the cost will be to run the building. The score represents the cost of energy required by a property over the course of a year with a 100 score meaning there's no energy cost. To calculate the SAP, the assessor uses information relating to lighting, heating, hot water systems, renewable technolgies used and the elements of structure.
How Is A SAP Assessment Undertaken?
Amongst other things, the SAP assessor will determine how good the thermal elements are in the floors and walls as well as how well heat passes through these elements - this is known as a 'U' value. A high 'U' value represents a high amount of heat lost - this is used in the SAP calculation which is done off-site but requires plans and drawings of the site in order to be calculated.
The SAP software will determine if a building complies with Building Regulations in Homerton using the information provided by the SAP assessment. This crucial information relates to the type of dwelling, floors, walls, the roof, windows, doors, lighting, renewable technologies, 'U' values, hot water and ventilation.
Why Do I Need A SAP Calculation?
Under Part L of Building Regulations in Homerton, since 2006, any new dwellings or conversions need to have a SAP Calculation and Predicted EPC before any work can begin.
If you are selling a home before it has been built, you will need to provide information about energy efficiency in a Predicted Energy Assessment (PEA).
It is the responsibility of the builder to provide any On Construction EPCs when a home is constructed. This will also apply if a building is converted into fewer or more units (material change of use) and changes are made to the heating, hot water provision or air conditioning/ventilation services.
Copyright 2024 E2 Specialist Consultants Limited
Company No. 06728970