Offices Nationwide

Reverberation Time
The reverberation time of a room is defined as the time it takes for sound to decay by 60 dB after an abrupt termination...more

Sound Insulation
Two parameters describe sound insulation; Dw and Rw. Dw is the insulation between rooms. Rw is the lab-tested insulation of a wall/floor...more
Part F
Means of Ventilation

Irlam - PEA - 0161 403 0129
The office that covers this area is: Manchester
Phone Number: 0161 403 0129 Email: irlam@e2consultants.co.uk
Our other services include:
PEA can also be known as:
New Build On Construction EPC, Domestic On Construction EPC, On Construction EPC, Predicted Energy Assessment, New Build On Construction Domestic EPC, New Build EPC, New Build Domestic EPC,


Copyright 2025 E2 Specialist Consultants Limited
Company No. 06728970