Offices Nationwide
Air Testing & Leakage
Our engineers use Thermal camera and extensive knowledge of buildings to help find leakage areas within the building and can advice of these.
Air Testing & Leakage
Air Pressure Testing is not just for new-builds, it can be used to find leakage areas in existing buildings, improve the air tightness and improve/stop drafts..more
Part E
Resistance of the Passage of Sound
Lancing - Air tightness testing - 0239 366 0106
The office that covers this area is: Portsmouth
Phone Number: 0239 366 0106 Email: lancing@e2consultants.co.uk
Air Testing is sometimes referred to as Domestic Air tests, Domestic Air pressure tests, Domestic Air leakage testing, Domestic Air pressure testing, Domestic Air tightness tests, Domestic Air tightness testing.
What Does An Air Leakage Test in Lancing Involve?
Employees can still do their job inside a commercial or domestic building in Lancing whilst the air test is being carried out, within reason, though may feel some discomfort due to the noise of the fan and the draught that will be felt throughout the building. There should be no outside access once the test has begun - which lasts for approximately 90 minutes, so plan accordingly.
Air tests cannot be carried out if the wind speed is more than 13mph - 3 metres per second is the ideal wind speed when undertaking an air test in Lancing. An air test involves placing a large fan, or several fans, to an opening within the property; usually a doorway. The fans will increase and decrease in speed that will in-turn change the building's air pressure and record the results.
During an air test in Lancing the pressure of the building will be tested and as such all windows and doors that lead outside must be securely closed to avoid them swinging open and the test being abandoned. Similarly, all internal doors should be wedged open to avoid being slammed shut. Furniture will not be affected during the test, but smaller items such as paper must be held down or removed completely so they're not blown about.
Why E2 Consultants?
All new buildings in England and Wales have had a mandatory requirement since 2006 (2010 in Scotland) that domestic and commercial buildings, must have a passing air leakage certificate before the property can be passed off by building regulations.
For a quote or for more information, call our air tightness / pressure testing consultants in Lancing on 0239 366 0106 or email us on Lancing@e2consultants.co.uk
At E2 Consultants we offer Air Pressure Testing throughout Lancing and surrounding areas. Our experienced air pressure testing consultants will also be happy to offer advice on the best ways to gain your target rating.
E2 Consultants offer a range of services from desktop reviews of drawings to pre test inspections on site to advice on air tightness, how to improve and what needs to be completed and sealed for the testing to take place successfully.
When Should The Test Take Place?
The air leakage should be completed once the building is completed. All doors and windows in place, all skirting boards sealed, traps filled with water and any penetrations through the envelope of the building need to be sealed. Please find checklist within the downloads section of the website which provide a comprehensive list of requirements. People who follow this checklist have a much higher change of passing the air test first time.
What Air Permeability Rating Do I Need?
The air tightness rating of a property is not a fixed figure. This is set by the design SAP Calculation carried out (please contact us if you also require a SAP Calculation in Lancing ). However the worst acceptable standard for air tightness is 10 m³/(h.m²) which resembles the amount of uncontrolled air that's leaking from the dwelling. However this does not mean that it would pass the SAP Calculations Design Air Permeability standard. Should the test fail, our air tightness team will help you identify where the leakages are happening in the hope that a passing score will be achieved after a re-test.
How Many Properties Need An Air Tightness Test?
According to Part L1a, an air pressure test needs to be undertaken on 50% of all dwelling types or three units of each type depending on which value is smaller. A block of flats is considered as a separate development and should be treated as such no matter on the number of blocks on the site. Furthermore, the testing should be done on the first batch of each type of dwelling to be completed. The need to test multiple versions of each type is to confirm the design and construction procedures are up to code according to Government regulations.
For further Domestic Air Integrity Testing information for your area, be sure to check out Air-Testing-Portsmouth.co.uk.
Copyright 2024 E2 Specialist Consultants Limited
Company No. 06728970