Offices Nationwide

Sound Intensity
Sound intensity's measured in Decibels (dB). An logarithmic scale where an increase of 10 dB gives an apparent doubling of loudness...more

Reverberation Time
The reverberation time of a room is defined as the time it takes for sound to decay by 60 dB after an abrupt termination...more
Part E
Resistance of the Passage of Sound

Llanrwst - TER DER Calc - 01407 320 107
The office that covers this area is: Anglesey
Phone Number: 01407 320 107 Email: llanrwst@e2consultants.co.uk
SAP Calculations is sometimes referred to as SAP Conversion Calcs, Part L1B Compliance, SAP Conversion Assessment, SAP Conversion Calculations, SAP Conversion rating, SAP Conversion Calc.
Why Do I Need A SAP Calculation?
It is the responsibility of the builder to provide any On Construction EPCs when a home is constructed. This will also apply if a building is converted into fewer or more units (material change of use) and changes are made to the heating, hot water provision or air conditioning/ventilation services.
Under Part L of Building Regulations in Llanrwst, since 2006, any new dwellings or conversions need to have a SAP Calculation and Predicted EPC before any work can begin.
If you are selling a home before it has been built, you will need to provide information about energy efficiency in a Predicted Energy Assessment (PEA).
How Is A SAP Assessment Undertaken?
The crucial information needed for the SAP software relates to the type of dwelling, floors, walls, the roof, windows, doors, lighting, renewable technologies, 'U' values, hot water and ventilation. With this, we can determine if a building complies with Building Regulations in Llanrwst.
A SAP is done off-site but requires plans and drawings of the site in order to be calculated. Amongst other things, the SAP assessor will determine how good the thermal elements are in the floors and walls and how well heat passes through these elements - this is known as a 'U' value. A high 'U' value represents a high amount of heat lost - this is used in the SAP calculation.
What Is A SAP Calculation?
The higher the SAP rating, the lower the cost will be to run the building. The score represents the cost of energy required by a property over the course of a year with a 100 score meaning there's no energy cost. To calculate the SAP, the assessor uses information relating to lighting, heating, hot water systems, renewable technolgies used and the elements of structure.
SAP calculations are the Government's Standard Assessment Procedure for Energy Ratings. In order to produce an On Construction EPC (Energy Performance Certificate) or a Predicted Energy Assessment (PEA), a SAP is required, as this is the calculation these certificates are based on.
Our other services include:
TER DER Calc can also be known as:
SAP Calc, SAP Assessment, SAP Rating, Domestic Carbon Emission Calculation, Domestic Carbon Emission Calc, TER DER Calculation, SAP Calculations, Standard Assessment Procedure,


Copyright 2025 E2 Specialist Consultants Limited
Company No. 06728970