Offices Nationwide
Air Testing
As part of thermographic surveys we can also use an air Pressure testing kit to depressurise the building and help detect any air leakage within the property..more
Sound Absorption
The loss of sound energy when sound waves come into contact with an absorbent material such as ceilings, walls, floors and other objects...more
Lossiemouth - TER DER Calcs - 0141 894 0107
The office that covers this area is: Glasgow
Phone Number: 0141 894 0107 Email: lossiemouth@e2consultants.co.uk
SAP Calculations is sometimes referred to as Part L1B Compliance, SAP Conversion rating, SAP Conversion Assessment, SAP Conversion Calculations, SAP Conversion Calc, SAP Conversion Calcs.
How Is A SAP Assessment Undertaken?
A SAP is done off-site but requires plans and drawings of the site in order to be calculated. Amongst other things, the SAP assessor will determine how good the thermal elements are in the floors and walls and how well heat passes through these elements - this is known as a 'U' value. A high 'U' value represents a high amount of heat lost - this is used in the SAP calculation.
The SAP software will determine if a building complies with Building Regulations in Lossiemouth using the information provided by the SAP assessment. This crucial information relates to the type of dwelling, floors, walls, the roof, windows, doors, lighting, renewable technologies, 'U' values, hot water and ventilation.
What Is A SAP Calculation?
A SAP calculation, the Government's Standard Assessment Procedure for Energy Ratings, is required to produce an On Construction EPC (Energy Performance Certificate) or a Predicted Energy Assessment (PEA).
A SAP rating represents the cost of energy required by a property over the course of a year with a score of 100 meaning there's no energy cost. This is calculated from lighting, heating, hot water systems, renewable technolgies used and the elements of structure. The higher the score, the lower the cost of running it.
Why Do I Need A SAP Calculation?
If you are selling a home before it has been built, you will need to provide information about energy efficiency in a Predicted Energy Assessment (PEA).
When changes are made to the heating, hot water provision or air conditioning/ventilation services, it is the responsibility of the builder to provide any On Construction EPCs upon completiong of a new home or conversion into fewer or more units.
Under Part L of Building Regulations in Lossiemouth, since 2006, any new dwellings or conversions need to have a SAP Calculation and Predicted EPC before any work can begin.
Copyright 2024 E2 Specialist Consultants Limited
Company No. 06728970