Offices Nationwide

Reverberation Time
The reverberation time of a room is defined as the time it takes for sound to decay by 60 dB after an abrupt termination...more

Sound Insulation
Two parameters describe sound insulation; Dw and Rw. Dw is the insulation between rooms. Rw is the lab-tested insulation of a wall/floor...more
Part E
Resistance of the Passage of Sound

Marlborough - New Build On Construction Domestic EPC - 01752 687 017
The office that covers this area is: Plymouth
Phone Number: 01752 687 017 Email: marlborough@e2consultants.co.uk
Our other services include:
New Build On Construction Domestic EPC can also be known as:
New Build On Construction EPC, Predicted Energy Assessment, New Build EPC, Domestic On Construction EPC, New Build Domestic EPC, PEA, On Construction EPC,


Copyright 2025 E2 Specialist Consultants Limited
Company No. 06728970