Noise above 85 dBA over time will cause hearing loss. In general, the louder the noise, the less time required before hearing loss...more
Environmental Noise Levels
The max exposure time at 85 dBA is 8 hours, at 110 dBA it's just 1 min 29 seconds. If exposed, limit the time and wear hearing protection...more
Stonehenge - Air Integrity Testing - 0239 366 0106
The office that covers this area is: Portsmouth
Phone Number: 0239 366 0106 Email: stonehenge@e2consultants.co.uk
Commercial_Air_Testing is sometimes referred to as Commercial AIR tests, Commercial AIR tightness tests, Commercial AIR tightness testing, Commercial AIR pressure testing, Commercial AIR pressure tests.
Air Integrity Testing in Stonehenge
Our air consultants offer constructive advice for Air Integrity Testing on what is the best way to reach your target rating.
According to Part L1a, an air pressure test needs to be undertaken on 50% of all dwelling types or three units of each type depending on which value is smaller. A block of flats is considered as a separate development and should be treated as such no matter on the number of blocks on the site. Furthermore, the testing should be done on the first batch of each type of dwelling to be completed. The need to test multiple versions of each type is to confirm the design and construction procedures are up to code according to Government regulations.
The dwellings that make up the test sample are to be chosen by the Building Control Body (BCB) as well as the pressure tester. When selecting the dwellings it should be taken into account that half of the tests for each type should be scheduled during construction of the first 25% of that type. All results, including failures, should be reported back to the BCB. Undertaking the test early in the project means any adjustments can be made before the majority of construction is complete.
Envelope Area (m2) | Leakage Rates (m3/hr at 50Pa) | |||||
5 | 7.5 | 10 | 15 | 20 | 25 | |
2000 | 0.51 | 0.76 | 1.01 | 1.52 | 2.03 | 2.54 |
5000 | 1.27 | 1.90 | 2.54 | 3.80 | 5.07 | 6.34 |
7500 | 90 | 2.85 | 3.80 | 5.71 | 7.61 | 9.51 |
10000 | 2.54 | 3.80 | 5.07 | 7.61 | 10.14 | 12.68 |
12500 | 3.17 | 4.75 | 6.34 | 9.51 | 12.68 | 15.85 |
15000 | 3.80 | 5.71 | 7.61 | 11.41 | 15.21 | 19.02 |
20000 | 5.07 | 7.61 | 10.14 | 15.21 | 20.29 | 25.36 |
Air Integrity Testing is sometimes referred to as an Air Pressure Test, Envelope Test or an Air Permeability Test.
It is a requirement under the Building Regulations 2015 Part L that new dwellings in Stonehenge must pass an Air Integrity Testing prior to occupation; this test certificate must be produced for the dwelling to be signed off by local Stonehenge building control.
The report has all the details required by the regulations to indicate that a valid test has been performed.
To carry out such a test with accurate results, we require some general requirements to be made available at the time of the test:
1. SAP Design air pressure test figure
2. Electricity supply
3. Water supply to enable traps to be filled./p>
We will seal all of the intentional leakage areas in the house prior to testing. These include: fireplaces, extractor fans, exhaust fans, trickle vents and the odd uninstalled component. Everything else will have to stay 'as is' in the property.
It's strongly suggested that if you've never had a test before, that you review our air pressure / tightness pre-test checklist below.
Air Tightness Pre-Test Checklist
For a quote or for more information, call our Stonehenge air tightness / pressure testing consultant on 0239 366 0106 or email stonehenge@e2consultants.co.uk
For further Air Integrity Testing information for your area, be sure to check out Air-Testing-Portsmouth.co.uk.