Offices Nationwide
Sound Absorption
The loss of sound energy when sound waves come into contact with an absorbent material such as ceilings, walls, floors and other objects...more
Good Hearing?
A typical person with good hearing can hear from about 20Hz to 20kHz (the audio bandwidth). A person's voice will usually range from 500Hz to 2kHz...more
Windmill Hill - Air Tightness Testing - 029 2193 0147
The office that covers this area is: Cardiff
Phone Number: 029 2193 0147 Email: windmill-hill@e2consultants.co.uk
Commercial_Air_Testing is sometimes referred to as Commercial AIR pressure testing, Commercial AIR pressure tests, Commercial AIR tightness testing, Commercial AIR tightness tests, Commercial AIR tests.
Air Tightness Testing in Windmill Hill
At E2 Consultants we offer Air Tightness Testing throughout Windmill Hill and surrounding areas. Our experienced Air Tightness Testing assessors will also be happy to offer advice on the best ways to gain your target rating. The number of properties to be tested should be in accordance with the following table:
The dwellings that make up the test sample are to be chosen by the Building Control Body (BCB) as well as the pressure tester. When selecting the dwellings it should be taken into account that half of the tests for each type should be scheduled during construction of the first 25% of that type. All results, including failures, should be reported back to the BCB. Undertaking the test early in the project means any adjustments can be made before the majority of construction is complete.
According to Part L1a, an air pressure test needs to be undertaken on 50% of all dwelling types or three units of each type depending on which value is smaller. A block of flats is considered as a separate development and should be treated as such no matter on the number of blocks on the site. Furthermore, the testing should be done on the first batch of each type of dwelling to be completed. The need to test multiple versions of each type is to confirm the design and construction procedures are up to code according to Government regulations.
Envelope Area (m2) | Leakage Rates (m3/hr at 50Pa) | |||||
5 | 7.5 | 10 | 15 | 20 | 25 | |
2000 | 0.51 | 0.76 | 1.01 | 1.52 | 2.03 | 2.54 |
5000 | 1.27 | 1.90 | 2.54 | 3.80 | 5.07 | 6.34 |
7500 | 90 | 2.85 | 3.80 | 5.71 | 7.61 | 9.51 |
10000 | 2.54 | 3.80 | 5.07 | 7.61 | 10.14 | 12.68 |
12500 | 3.17 | 4.75 | 6.34 | 9.51 | 12.68 | 15.85 |
15000 | 3.80 | 5.71 | 7.61 | 11.41 | 15.21 | 19.02 |
20000 | 5.07 | 7.61 | 10.14 | 15.21 | 20.29 | 25.36 |
Air Tightness Testing is sometimes referred to as an Air Pressure Test, Envelope Test or an Air Permeability Test.
It is a requirement under the Building Regulations 2015 Part L that new dwellings in Windmill Hill must pass an Air Tightness Testing prior to occupation; this test certificate must be produced for the dwelling to be signed off by local Windmill Hill building control.
The report has all the details required by the regulations to indicate that a valid test has been performed.
To carry out such a test with accurate results, we require some general requirements to be made available at the time of the test:
1. SAP Design air pressure test figure
2. Electricity supply
3. Water supply to enable traps to be filled./p>
We will seal all of the intentional leakage areas in the house prior to testing. These include: fireplaces, extractor fans, exhaust fans, trickle vents and the odd uninstalled component. Everything else will have to stay 'as is' in the property.
It's strongly suggested that if you've never had a test before, that you review our air pressure / tightness pre-test checklist below.
Air Tightness Pre-Test Checklist
For a quote or for more information, call our Windmill Hill air tightness / pressure testing consultant on 029 2193 0147 or email windmill-hill@e2consultants.co.uk
For further Air Tightness Testing information for your area, be sure to check out Air-Testing-Cardiff.co.uk.
Copyright 2024 E2 Specialist Consultants Limited
Company No. 06728970