Offices Nationwide
Air Testing
As part of thermographic surveys we can also use an air Pressure testing kit to depressurise the building and help detect any air leakage within the property..more
Sound Levels
Decibels (dB) are most commonly used as a measure of sound level, but they are also used in electronics, signals and communications...more
Gainsborough - SAP Calculations - 0114 368 0192
The office that covers this area is: Sheffield
Phone Number: 0114 368 0192 Email: gainsborough@e2consultants.co.uk
SAP Calculations is sometimes referred to as SAP Conversion Calculations, SAP Conversion Calcs, SAP Conversion Calc, SAP Conversion Assessment, Part L1B Compliance, SAP Conversion rating.
Why Do I Need A SAP Calculation?
Under Part L of Building Regulations in Gainsborough, since 2006, any new dwellings or conversions need to have a SAP Calculation and Predicted EPC before any work can begin.
If you are selling a home before it has been built, you will need to provide information about energy efficiency in a Predicted Energy Assessment (PEA).
When changes are made to the heating, hot water provision or air conditioning/ventilation services, it is the responsibility of the builder to provide any On Construction EPCs upon completiong of a new home or conversion into fewer or more units.
How Is A SAP Assessment Undertaken?
The SAP software will determine if a building complies with Building Regulations in Gainsborough using the information provided by the SAP assessment. This crucial information relates to the type of dwelling, floors, walls, the roof, windows, doors, lighting, renewable technologies, 'U' values, hot water and ventilation.
A SAP is done off-site but requires plans and drawings of the site in order to be calculated. Amongst other things, the SAP assessor will determine how good the thermal elements are in the floors and walls and how well heat passes through these elements - this is known as a 'U' value. A high 'U' value represents a high amount of heat lost - this is used in the SAP calculation.
What Is A SAP Calculation?
The higher the SAP rating, the lower the cost will be to run the building. The score represents the cost of energy required by a property over the course of a year with a 100 score meaning there's no energy cost. To calculate the SAP, the assessor uses information relating to lighting, heating, hot water systems, renewable technolgies used and the elements of structure.
A SAP calculation, the Government's Standard Assessment Procedure for Energy Ratings, is required to produce an On Construction EPC (Energy Performance Certificate) or a Predicted Energy Assessment (PEA).
Copyright 2024 E2 Specialist Consultants Limited
Company No. 06728970