Offices Nationwide 

Noise Disturbance

Building acoustics can help to mitigate the effects of noise disturbance which can have negative effects on health, well-being and general quality of life.

The Noise Policy Statement for England (NPSE) defines noise pollution as:

- Environmental noise: which includes noise from transportation sources. - Neighbour noise: which includes noise from inside and outside buildings. - Neighbourhood noise: which includes noise arising from industrial and entertainment premises, trade and businesses, construction sites and noise in the street.

This can be an important consideration for the location, design and construction of new developments.

Sound Absorption

The loss of sound energy when sound waves come into contact with an absorbent material such as ceilings, walls, floors and other objects.

Point of Reference

Points of Reference *measured in dBA or decibels:

  • 0 The softest sound a person can hear with normal hearing
  • 10 normal breathing
  • 20 whispering at 5 feet
  • 30 soft whisper
  • 50 rainfall
  • 60 normal conversation
  • 110 shouting in ear
  • 120 thunder

Sound Insulation

Two parameters are used to describe the sound insulation of a partition, Dw and Rw. Dw represents the sound insulation between rooms on-site. Since these figures describe the fnal site requirements, Dw levels are specified by clients and Building Regulations. Rw represents the lab tested sound insulation of an element making up a partition wall/floor type. Due to flanking and other factors, lab rated sound reduction levels will not be achieved on-site. Conventionally, there is a 5 to 10 dB reduction between a Rw lab tested figure and an on-site Dw figure. The conversion between Dw and Rw is relatively complex and takes into consideration receiver room volume, receiver room reverberation times and the area of the separating partition. The conversion between Rw and Dw should always be calculated.

E2 Specialist Consultants
August 13 at 1:29pm
Today takes 2 of our engineers, air testing this enormous modular classroom in Tring, It took 4 fans to test this space and unfortunately resulted in a Fail. Remedial sealing will be required to areas that we have identified as leaking cold air infiltration. #preperationiskey

E2 Consultants Delivering compliance solutions for Architects & Developers    Head Office E2 HOUSE, South Park Way, Wakefield 41 Business Park, WF2 0XJ    Questions? Call: 0800 043 8100

»
DidYouKnow