Offices Nationwide

Sound Transmissions
Paths can be interrupted by insulation and blocking air paths. A material's insulation is governed by mass, stiffening and damping...more

Reverberation Time
The reverberation time of a room is defined as the time it takes for sound to decay by 60 dB after an abrupt termination...more
Part F
Means of Ventilation

Eastham - New Build On Construction EPCs - 0121 381 0129
The office that covers this area is: Birmingham
Phone Number: 0121 381 0129 Email: eastham@e2consultants.co.uk
Our other services include:
New Build On Construction EPCs can also be known as:
Predicted Energy Assessment, On Construction EPC, Domestic On Construction EPC, New Build EPC, New Build On Construction Domestic EPC, New Build Domestic EPC, New Build On Construction EPC, PEA,


Copyright 2025 E2 Specialist Consultants Limited
Company No. 06728970