Offices Nationwide
Sound Transmissions
Paths can be interrupted by insulation and blocking air paths. A material's insulation is governed by mass, stiffening and damping...more
Reverberation Time
The reverberation time of a room is defined as the time it takes for sound to decay by 60 dB after an abrupt termination...more
Part L1A
Conservation of fuel and power IN NEW DWELLINGS
Copyright 2024 E2 Specialist Consultants Limited
Company No. 06728970
In County S
On Construction EPCs in Shropshire, On Construction EPCs in Somerset, On Construction EPCs in South Yorkshire, On Construction EPCs in Staffordshire, On Construction EPCs in Stirlingshire, On Construction EPCs in Strathclyde, On Construction EPCs in Suffolk, On Construction EPCs in Surrey, On Construction EPCs in Swansea County,