Offices Nationwide 

Porth - Air pressure tests - 029 2193 0147

The office that covers this area is: Cardiff

Phone Number: 029 2193 0147 Email: porth@e2consultants.co.uk

Air Testing is sometimes referred to as Domestic Air pressure tests, Domestic Air leakage testing, Domestic Air pressure testing, Domestic Air tightness testing, Domestic Air tightness tests, Domestic Air tests.

Do I Need An Air Leakage Test?

On a large plot of new houses that are built to a similar specification, only a sample of the houses will need to be air tested. This is outlined in Part L of Government building regulations.

Domestic properties and commercial buildings over a certain size must have a passing air leakage certificate before the property can be handed over following a sale. All new buildings in England and Wales have had this requirement since 2006 and in Scotland this has been mandatory since 2010.

Planning your test in advance will help our experience air assessment team covering Porth to determine how many tests you'll need ahead of time per property and will be happy to offer advice on the best ways to gain your air permeability rating.

What Air Permeability Rating Do I Need?

A passing score in Porth is 10 m³/(h.m²) for an air permeability rating which resembles the amount of uncontrolled air that's leaking from the dwelling. Should the test fail, our air tightness team will help you identify where the leakages are happening in the hope that a passing score will be achieved after a re-test.

What Does An Air Leakage Test Involve?

An air test involves placing a large fan, or several fans, to an opening within the property; usually a doorway. The fans will increase and decrease in speed that will in-turn change the building's air pressure and record the results. Please note: an air test cannot be carried out if wind speed is more than 13mph. 3 metres per second is the ideal wind speed when undertaking an air test in Porth.

During an air test in Porth the pressure of the room will be tested and as such all windows and doors that lead outside must be securely closed to avoid them swinging open and the test being abandoned. Similarly, all internal doors should be wedged open to avoid being slammed shut. Furniture will not be affected during the test, but smaller items such as paper must be held down or removed completely so they're not blown about.

There should be no outside access once the test has begun for approximately 90 minutes so plan accordingly. Workers can still do their job inside the property, within reason, though may feel some discomfort due to the noise of the fan and the draught that will be felt throughout the building.

When Should The Test Take Place?

For obvious reasons, an air pressure test is generally one of the last surveys to be undertaken once all the walls, windows, doors etc. are complete and sealed to stop any air escaping and prevent drafts through the property. The building envelope will also need to be completed.

How Many Properties Need An Air Tightness Test?

If you have 4 or less properties of the same type then only one test needs to be undertaken per type. If you have more than 4 but less than 40 dwellings of a type then you need at least two tests to be done on each type. Finally, if there are more than 40 properties of a particular type then at least 5% of each type needs to be tested UNLESS the first 5 get a passing score - then this can be dropped to just 2%.

For further Domestic Air Pressure Testing information for your area, be sure to check out Air-Testing-Cardiff.co.uk.

E2 Specialist Consultants
August 13 at 1:29pm
Today takes 2 of our engineers, air testing this enormous modular classroom in Tring, It took 4 fans to test this space and unfortunately resulted in a Fail. Remedial sealing will be required to areas that we have identified as leaking cold air infiltration. #preperationiskey

E2 Consultants Delivering compliance solutions for Architects & Developers    Head Office E2 HOUSE, South Park Way, Wakefield 41 Business Park, WF2 0XJ    Questions? Call: 0800 043 8100