Offices Nationwide
Environmental Noise Levels
The max exposure time at 85 dBA is 8 hours, at 110 dBA it's just 1 min 29 seconds. If exposed, limit the time and wear hearing protection...more
Sound Transmissions
Paths can be interrupted by insulation and blocking air paths. A material's insulation is governed by mass, stiffening and damping...more
Part L1A
Conservation of fuel and power IN NEW DWELLINGS
Bishop Auckland - SAP Assessment - 0191 633 0103
The office that covers this area is: Newcastle
Phone Number: 0191 633 0103 Email: bishop-auckland@e2consultants.co.uk
SAP Calculations is sometimes referred to as SAP Conversion Assessment, SAP Conversion Calcs, SAP Conversion rating, SAP Conversion Calculations, SAP Conversion Calc, Part L1B Compliance.
What Is A SAP Calculation?
The higher the SAP rating, the lower the cost will be to run the building. The score represents the cost of energy required by a property over the course of a year with a 100 score meaning there's no energy cost. To calculate the SAP, the assessor uses information relating to lighting, heating, hot water systems, renewable technolgies used and the elements of structure.
SAP calculations are the Government's Standard Assessment Procedure for Energy Ratings. In order to produce an On Construction EPC (Energy Performance Certificate) or a Predicted Energy Assessment (PEA), a SAP is required, as this is the calculation these certificates are based on.
How Is A SAP Assessment Undertaken?
A SAP is done off-site but requires plans and drawings of the site in order to be calculated. Amongst other things, the SAP assessor will determine how good the thermal elements are in the floors and walls and how well heat passes through these elements - this is known as a 'U' value. A high 'U' value represents a high amount of heat lost - this is used in the SAP calculation.
The crucial information needed for the SAP software relates to the type of dwelling, floors, walls, the roof, windows, doors, lighting, renewable technologies, 'U' values, hot water and ventilation. With this, we can determine if a building complies with Building Regulations in Bishop Auckland.
Why Do I Need A SAP Calculation?
Under Part L of Building Regulations in Bishop Auckland, since 2006, any new dwellings or conversions need to have a SAP Calculation and Predicted EPC before any work can begin.
You will need to provide information about energy efficiency in a Predicted Energy Assessment (PEA) if you are planning to sell the property before it has been built.
When changes are made to the heating, hot water provision or air conditioning/ventilation services, it is the responsibility of the builder to provide any On Construction EPCs upon completiong of a new home or conversion into fewer or more units.
Copyright 2024 E2 Specialist Consultants Limited
Company No. 06728970