Offices Nationwide
Sound Privacy
Privacy describes the perceived sound reduction across a wall, a function of both sound insulation and background noise...more
Air Testing & Leakage
We can offer additional services at discounted rates along side our tests! These are Sound Testing and Part F. Ask our Consultants for more
Part L1A
Conservation of fuel and power IN NEW DWELLINGS
SAP Calculations is sometimes referred to as SAP Conversion Calculations, SAP Conversion rating, SAP Conversion Assessment, Part L1B Compliance, SAP Conversion Calcs, SAP Conversion Calc.
SAP Calculations Across the UK
Why Do I Need A SAP Calculation?
It is the responsibility of the builder to provide any On Construction EPCs when a home is constructed. This will also apply if a building is converted into fewer or more units (material change of use) and changes are made to the heating, hot water provision or air conditioning/ventilation services.
If you are selling a home before it has been built, you will need to provide information about energy efficiency in a Predicted Energy Assessment (PEA).
Under Part L of Building Regulations in the UK, since 2006, any new dwellings or conversions need to have a SAP Calculation and Predicted EPC before any work can begin.
How Is A SAP Assessment Undertaken?
The SAP software will determine if a building complies with Building Regulations in the UK using the information provided by the SAP assessment. This crucial information relates to the type of dwelling, floors, walls, the roof, windows, doors, lighting, renewable technologies, 'U' values, hot water and ventilation.
Amongst other things, the SAP assessor will determine how good the thermal elements are in the floors and walls as well as how well heat passes through these elements - this is known as a 'U' value. A high 'U' value represents a high amount of heat lost - this is used in the SAP calculation which is done off-site but requires plans and drawings of the site in order to be calculated.
What Is A SAP Calculation?
SAP calculations are the Government's Standard Assessment Procedure for Energy Ratings. In order to produce an On Construction EPC (Energy Performance Certificate) or a Predicted Energy Assessment (PEA), a SAP is required, as this is the calculation these certificates are based on.
The higher the SAP rating, the lower the cost will be to run the building. The score represents the cost of energy required by a property over the course of a year with a 100 score meaning there's no energy cost. To calculate the SAP, the assessor uses information relating to lighting, heating, hot water systems, renewable technolgies used and the elements of structure.
Copyright 2024 E2 Specialist Consultants Limited
Company No. 06728970
In County S
Part L1B Compliance in Shropshire, Part L1B Compliance in Somerset, Part L1B Compliance in South Yorkshire, Part L1B Compliance in Staffordshire, Part L1B Compliance in Stirlingshire, Part L1B Compliance in Strathclyde, Part L1B Compliance in Suffolk, Part L1B Compliance in Surrey, Part L1B Compliance in Swansea County,