Offices Nationwide
Air Testing & Leakage
We can offer additional services at discounted rates along side our tests! These are Sound Testing and Part F. Ask our Consultants for more
Sound Levels
Decibels (dB) are most commonly used as a measure of sound level, but they are also used in electronics, signals and communications...more
Part L1A
Conservation of fuel and power IN NEW DWELLINGS
Harlow - SAP Assessment - 020 3390 0301
The office that covers this area is: London
Phone Number: 020 3390 0301 Email: harlow@e2consultants.co.uk
SAP Calculations is sometimes referred to as SAP Conversion Calc, SAP Conversion Calculations, SAP Conversion Calcs, SAP Conversion rating, Part L1B Compliance, SAP Conversion Assessment.
What Is A SAP Calculation?
SAP calculations are the Government's Standard Assessment Procedure for Energy Ratings. In order to produce an On Construction EPC (Energy Performance Certificate) or a Predicted Energy Assessment (PEA), a SAP is required, as this is the calculation these certificates are based on.
The higher the SAP rating, the lower the cost will be to run the building. The score represents the cost of energy required by a property over the course of a year with a 100 score meaning there's no energy cost. To calculate the SAP, the assessor uses information relating to lighting, heating, hot water systems, renewable technolgies used and the elements of structure.
How Is A SAP Assessment Undertaken?
The SAP software will determine if a building complies with Building Regulations in Harlow using the information provided by the SAP assessment. This crucial information relates to the type of dwelling, floors, walls, the roof, windows, doors, lighting, renewable technologies, 'U' values, hot water and ventilation.
Amongst other things, the SAP assessor will determine how good the thermal elements are in the floors and walls as well as how well heat passes through these elements - this is known as a 'U' value. A high 'U' value represents a high amount of heat lost - this is used in the SAP calculation which is done off-site but requires plans and drawings of the site in order to be calculated.
Why Do I Need A SAP Calculation?
Under Part L of Building Regulations in Harlow, since 2006, any new dwellings or conversions need to have a SAP Calculation and Predicted EPC before any work can begin.
When changes are made to the heating, hot water provision or air conditioning/ventilation services, it is the responsibility of the builder to provide any On Construction EPCs upon completiong of a new home or conversion into fewer or more units.
You will need to provide information about energy efficiency in a Predicted Energy Assessment (PEA) if you are planning to sell the property before it has been built.
Copyright 2024 E2 Specialist Consultants Limited
Company No. 06728970